Sound Division
Multimeter Lead with Alligator Clips 1m long lead

Multimeter Lead with Alligator Clips 1m long lead

SKU: TT1125
$12.50

Volume Pricing

Buy 1+ $12.50 (incl. GST)
Henderson In Stock
Albany In Stock
NZ-wide delivery available

1000V 20A Multimeter Test Leads

Probes Banana Plug, 24K Gold

Digital Multimeter Probes

Electrical Test Probe for most Multimeter

• A pair of Digital Multimeter Probes ( 1 Black and 1 Red)

• A pair of Test Leads Plug ( 1 Black and 1 Red)

Package included:


• 【Easy To Use】Plug and play, Easy for installation and safe for use with the insulation plastic boots covered.

• 【Wide Applicantion】Perfect for connecting a compatible electrical test meter to a device and testing electrical wiring circuits. Wide use for measuring current, voltage, resistance, as well as continuity, transistor, and diode testing.

• 【Premium test tip and plug】Gold-plated test lead tips which does not easily break-off,has solid contact traits and speedy and stable measuring reaction times.And the kit will protect it against dust and oxidation.An efficient and stable connection is thus ensured.

• 【Even higher Copper Core requirements】Contains 42 pure copper-core wires;Easily dealing with currents of 20A and preventing leakage issues from occurring.Adopting advanced ultra-soft PVC line silicone, more flexible, long service life.

• 【Security Level And Heavy Duty】 It is safe to test CAT III 1000V rated current 20A current, perfectly fits all kinds of multimeters like clamp meters, digital multimeters, table meters

Features:

1000V 20A Multimeter Test Leads Probes Banana Plug, 24K Gold Digital Multimeter Probes Electrical Test Probe for most Multimeter


Reviews

No reviews yet

Be the first to review this product.

Customers Also Viewed